Hole 116: 2.5 Metres Grading 70.34% U3O8             Hole 94: 5.5 Metres Grading 12.62% U3O8             Hole 80: 18.5 Metres Grading 3.43% U3O8             Hole 79: 12 Metres Grading 10.18% U3O8             Hole 12: 11.9 metres grading 5.29% U3O8             Hole 19: 2.1 metres grading 4.11% U3O8             Hole 20: 15 metres grading 10.02% U3O8 including 2 metres grading 43.85% U3O8             Hole 21: 9 metres grading 10.06% U3O8 including 3 metres grading 22.72% U3O8             Hole 22: 6.5 metres grading 2.27% U3O8             Hole 28: 9.5 metres grading 2.60% U3O8 including 2 metres at 10.39% U3O8             Hole 30: 69 metres grading 2.33% U3O8             Hole 32: 6.5 metres grading 20.41% U3O8             Hole 37: 18 metres grading 4.15% U3O8             Hole 40: 23 metres grading 11.23% U3O8             Hole 42: 3.5 metres grading 5.92% U3O8             Hole 44: 13.5m grading 2.6% U3O8             Hole 56: 15 metres grading 12.03% U3O8 including 0.5 metres grading 70.7% U3O8             Hole 79: 12 Metres Grading 10.18% U3O8             Hole 80: 18.5 Metres Grading 3.43% U3O8             Hole 94: 5.5 Metres Grading 12.62% U3O8             Hole 116: 2.5 Metres Grading 70.34% U3O8
Projects
Roughrider Update March 2009
Email 'Roughrider Update March 2009' item to a friendShow printable version of 'Roughrider Update March 2009' item in a New Window
The following series of level (horizontal) plans, each +/- 10 metres in depth, illustrates the spatial and grade variation of uranium mineralization intersected in diamond drill holes from the Roughrider Zone as reported to date (March 17, 2009). Of particular note are:


View PDF

Please click to advance frames
view presentation
View PPT

View Video