
| December 01, 2009 Forum And Hathor Prepare For $1.65 Million Drill Program On The Henday Project, Athabasca Basin | |
Vancouver - Forum Uranium Corp. (FDC: TSX-V) and Hathor Exploration Limited (HAT:TSX-V) have preparations well underway for the January drill program and geophysical survey on the Henday Lake project in northern Saskatchewan.
Figure 1: Location Map of the Henday Project. ![]() The ellipse shows the planned drill area (Mallen Lake). The drill program will be concentrated along a N70 structure that shows promising gravity lows (see Figure 2) which have been used successfully in identifying the Roughrider Zone. Permit applications have been submitted and a contract signed with TEAM Drilling for approximately 4,500 metres slated to start in January of 2010. In addition to drilling, a geophysical survey consisting of IP Resistivity and gravity along another high priority structure is planned in preparation for possible drilling in 2011. Figure 2: Contoured gravity and EM, Henday Lake Project. ![]() The reds are gravity highs, the blues are gravity lows, and the white lines are graphitic conductors. Drill targets are outlined by the red ellipses. The existing illite anomaly, discovered by drilling at Mallen Lake in 2008, is located in the northeast corner of the survey. The 2010 exploration program is being funded 100% by Hathor Exploration as part of their earn-in process. The 2010 exploration program, upon completion, will bring Hathor's ownership of the project to 40%. Under terms of the option, Hathor must spend $3.5 million in exploration over three years to earn a 60% interest in the project. Ken Wheatley, P.Geo. (Saskatchewan, Nunavut), Vice President, Exploration is the Qualified Person that has reviewed the contents of this news release. For more information on Hathor, please visit the company's website: www.hathor.ca or contact Tony Nunziata at 403-560-7040 or JJ Jennex at 604-684-6707. Hathor Exploration Limited Stephen G. Stanley, Director Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. | |
You can view the Next News Releases item: Fri Dec 4, 2009, Hathor Announces a Success Fee paid in Connection with the Closing of the Plan of Arrangement with NCR You can view the Previous News Releases item: Mon Nov 23, 2009, Hathor and NCR Jointly Announce Plan of Arrangement has Closed You can return to the main News Releases page, or press the Back button on your browser. |