Hole 116: 2.5 Metres Grading 70.34% U3O8             Hole 94: 5.5 Metres Grading 12.62% U3O8             Hole 80: 18.5 Metres Grading 3.43% U3O8             Hole 79: 12 Metres Grading 10.18% U3O8             Hole 12: 11.9 metres grading 5.29% U3O8             Hole 19: 2.1 metres grading 4.11% U3O8             Hole 20: 15 metres grading 10.02% U3O8 including 2 metres grading 43.85% U3O8             Hole 21: 9 metres grading 10.06% U3O8 including 3 metres grading 22.72% U3O8             Hole 22: 6.5 metres grading 2.27% U3O8             Hole 28: 9.5 metres grading 2.60% U3O8 including 2 metres at 10.39% U3O8             Hole 30: 69 metres grading 2.33% U3O8             Hole 32: 6.5 metres grading 20.41% U3O8             Hole 37: 18 metres grading 4.15% U3O8             Hole 40: 23 metres grading 11.23% U3O8             Hole 42: 3.5 metres grading 5.92% U3O8             Hole 44: 13.5m grading 2.6% U3O8             Hole 56: 15 metres grading 12.03% U3O8 including 0.5 metres grading 70.7% U3O8             Hole 79: 12 Metres Grading 10.18% U3O8             Hole 80: 18.5 Metres Grading 3.43% U3O8             Hole 94: 5.5 Metres Grading 12.62% U3O8             Hole 116: 2.5 Metres Grading 70.34% U3O8
News
News Releases
Sep 08, 2010 Hathor Announces Results of Annual General Meeting
Sep 01, 2010 Hathor Extends Roughrider East 60 m to the East as Summer Drill Program Progresses
Jul 13, 2010 Hathor Commences Three Rig Drill Program at its Roughrider Uranium Deposit
Jun 29, 2010 Hathor Receives Final Winter Assays and Plans an Aggressive Summer Drill Program to Test the Full Potential of Roughrider East
Jun 21, 2010 Summer Exploration Planned at Henday to Follow Up Alteration and Mineralization Outlined during the 2010 Winter Drill Program
Jun 16, 2010 High Grade Uranium Intersections at Roughrider Bolstered by Recoveries of up to 98.9% in Metallurgical Leach Tests
Jun 08, 2010 Hathor Intersects 7.5 m at 43.64 % U3O8 and 23 m at 24.31 % U3O8 in Two Separate Holes: the Best Results to Date at Roughrider
Jun 02, 2010 New Mineralization Discovered in Area 3 at Roughrider, With Assays up to 26.5 m of 3.55% U3O8 , including 6.0 m of 14.46 % U3O8
May 27, 2010 New Zones Discovered at Roughrider Return Assays as High as 22.50 m of 11.31 % U3O8
Apr 27, 2010 Hathor Intersects 22.5% U3O8 over 12 m at Roughrider East
Apr 21, 2010 Hathor Plans Detailed Follow-up Drilling as Roughrider East Gives 100 m of Strike Extent to Uranium Mineralization
Apr 19, 2010 Summer Exploration Gearing Up at Russell Lake
Apr 15, 2010 Roughrider Continues to Grow
Apr 13, 2010 Roughrider Continues to Grow with Massive Uranium Mineralization and Off-Scale Radioactivity
Mar 29, 2010 Numerous New Zones of Off-Scale Radioactivity and Visible Uranium Mineralization Intersected At Roughrider Uranium Deposit
Mar 23, 2010 Significant Alteration Intersected on Henday Property; a Follow-Up Summer Drill Program is Planned
Mar 22, 2010 $15,000,000 Over-subscribed Bought Deal Flow-Through Financing Closes
Mar 08, 2010 Hathor Exploration Limited Announces $10 Million Bought Deal Flow-Through Common Share Financing
Mar 05, 2010 Hathor Completes the First Drill Fence at the Roughrider Zone East Discovery
Mar 03, 2010 Hathor Intersects 81.5 m of 1.59 % U3O8 at Roughrider Zone East, including a 13.5 m interval of 6.52 % U3O8 with assays as high as 68.1 % U3O8
Feb 25, 2010 Hathor Intersects Off-Scale Radioactivity in Seven Holes at Roughrider Zone East
Feb 08, 2010 Hathor And Forum Commence Drilling At The Henday Project, Athabasca Basin
Jan 28, 2010 Hathor Commences Drilling at Midwest NorthEast Property
Jan 05, 2010 Dr. Michael H. Gunning Joins Hathor's Board of Directors and is Appointed Chief Operating Officer