Hole 116: 2.5 Metres Grading 70.34% U3O8             Hole 94: 5.5 Metres Grading 12.62% U3O8             Hole 80: 18.5 Metres Grading 3.43% U3O8             Hole 79: 12 Metres Grading 10.18% U3O8             Hole 12: 11.9 metres grading 5.29% U3O8             Hole 19: 2.1 metres grading 4.11% U3O8             Hole 20: 15 metres grading 10.02% U3O8 including 2 metres grading 43.85% U3O8             Hole 21: 9 metres grading 10.06% U3O8 including 3 metres grading 22.72% U3O8             Hole 22: 6.5 metres grading 2.27% U3O8             Hole 28: 9.5 metres grading 2.60% U3O8 including 2 metres at 10.39% U3O8             Hole 30: 69 metres grading 2.33% U3O8             Hole 32: 6.5 metres grading 20.41% U3O8             Hole 37: 18 metres grading 4.15% U3O8             Hole 40: 23 metres grading 11.23% U3O8             Hole 42: 3.5 metres grading 5.92% U3O8             Hole 44: 13.5m grading 2.6% U3O8             Hole 56: 15 metres grading 12.03% U3O8 including 0.5 metres grading 70.7% U3O8             Hole 79: 12 Metres Grading 10.18% U3O8             Hole 80: 18.5 Metres Grading 3.43% U3O8             Hole 94: 5.5 Metres Grading 12.62% U3O8             Hole 116: 2.5 Metres Grading 70.34% U3O8
Projects
Milliken Creek Project
Email 'Milliken Creek Project' item to a friendShow printable version of 'Milliken Creek Project' item in a New Window
Hathor's 100% owned Milliken Creek property is comprised of one claim totalling 3,995 hectares (9,872 acres) that is located approximately 26 km south-southeast from the richest uranium mine development project in the world, the Cigar Lake orebody where proven and probable ore reserves average 20.7% U3O8.

Depth to the Athabasca unconformity is estimated to be 80 to 125 metres. Exploration work completed or in progress includes lake sediment geochemistry, a high-resolution airborne tri-axial gradiometric magnetic survey, lineament analysis and a high-resolution 2D reflection seismic survey.

Exploration work planned includes ground gravity surveys, fixed and/or moving loop ground TEM surveys and resistivity surveys to help identify areas of sandstone alteration. Drill targets will be established when the aforementioned work is completed.