Hole 116: 2.5 Metres Grading 70.34% U3O8             Hole 94: 5.5 Metres Grading 12.62% U3O8             Hole 80: 18.5 Metres Grading 3.43% U3O8             Hole 79: 12 Metres Grading 10.18% U3O8             Hole 12: 11.9 metres grading 5.29% U3O8             Hole 19: 2.1 metres grading 4.11% U3O8             Hole 20: 15 metres grading 10.02% U3O8 including 2 metres grading 43.85% U3O8             Hole 21: 9 metres grading 10.06% U3O8 including 3 metres grading 22.72% U3O8             Hole 22: 6.5 metres grading 2.27% U3O8             Hole 28: 9.5 metres grading 2.60% U3O8 including 2 metres at 10.39% U3O8             Hole 30: 69 metres grading 2.33% U3O8             Hole 32: 6.5 metres grading 20.41% U3O8             Hole 37: 18 metres grading 4.15% U3O8             Hole 40: 23 metres grading 11.23% U3O8             Hole 42: 3.5 metres grading 5.92% U3O8             Hole 44: 13.5m grading 2.6% U3O8             Hole 56: 15 metres grading 12.03% U3O8 including 0.5 metres grading 70.7% U3O8             Hole 79: 12 Metres Grading 10.18% U3O8             Hole 80: 18.5 Metres Grading 3.43% U3O8             Hole 94: 5.5 Metres Grading 12.62% U3O8             Hole 116: 2.5 Metres Grading 70.34% U3O8
Projects
Grayling Project
Email 'Grayling Project' item to a friendShow printable version of 'Grayling Project' item in a New Window
Hathor has a 100% interest in his large property (18,997 hectares (46,942 acres)) located in the heart of the Athabasca Uranium Corridor. Bordered to the east by Denison's Moore Lake project, the Grayling Project is only 20 kilometres northeast of the historic Key Lake Mine where over 200 million pounds of uranium oxide where mined over a 14-year period.